Hello, welcome toJi'nan Heng Xu Test Machine Technology Co., Ltd.Official website!
Ji'nan Heng Xu Test Machine Technology Co., Ltd.
电话
Classification

JB-300BSemi-automatic impact testing machine

Taxonomy:Impact test machine
Times of browsing:554

Brief introduction:I. equipment name: semi-automatic impact tester.Two, model: JB-300BThree,

Information Hotline:400-6088-904

I. equipment name: semi-automatic impact tester.

Two, model: JB-300B

Three, performance description:

This machine is mainly used to measure the impact resistance of metal materials under dynamic load, so as to judge the properties of materials under dynamic load.

This machine is a semi-automatic control testing machine with simple operation and high efficiency. It is controlled by swinging, impact and setting-off electrical apparatus. It can automatically swing the remaining energy after punching the sample to prepare for the next test. It is especially suitable for continuous impact testing laboratories and metallurgical and mechanical manufacturing industries which do a lot of impact testing. JB-300B impact tester conforms to GB/T3808-2002 "Test of pendulum impact tester". According to GB/T229-2007 "Metal Charpy pendulum impact test method", the impact test of metal materials is carried out.

Four. Main technical indicators:

1, impact energy: 150J, 300J

2, pendulum preheating angle: 150 degrees.

3. The distance from the center of the pendulum axis to the impact point: 800mm

4, impact speed: 5.4m/s

5. Specimen bearing span: 40mm

6, jaw angle: R1-1.5mm

7, impact rounded corners: R2-2.5mm

8, impact knife thickness: 16mm

9. Angle accuracy: + 0.1 degrees.

11. Sample size: 10 x 10 x 55mm

12, outline size: 2300 mm x 600 mm x 1400 mm

13. The net weight of the tester is 550Kg

14, power supply: AC three phase 380V + 10% 50HZ 5A

15. Environmental conditions: no corrosive medium in the surrounding environment, no vibration, no strong electromagnetic field.

Five, main equipment configuration:

1, 300 Joule host.

2, 150J, 300J pendulum each one.

3, a motor (mounted on the main engine);

4. Take one set of swinging transmission device (mounted on the main engine).

5, a set of insurance agencies (installed on the host);

6, a set of safety protection devices;

7, one support adjustment device.

8. One pair of sample centralizer;

Six. Quality assurance:

After the formal acceptance of the equipment, the equipment shall be regarded as a formal delivery. The three package period is one year from the date of formal delivery. During the three-package period, the supplier will provide free maintenance service in time for all kinds of equipment failures, and free replacement in time for all kinds of parts damaged by non-human activities. If the equipment out of warranty fails in use, the supplier shall serve the orderer in time and actively assist the orderer to complete the maintenance task.

Seven. Acceptance and after sales service:

1. After the installation, commissioning and acceptance of the equipment are qualified, the supplier shall provide free training for the operators in the operation and maintenance of the equipment.

2. The equipment will be guaranteed free of charge for 12 months after acceptance and commissioning, and be responsible for long-term maintenance after the expiration of the warranty.

3, after the installation and commissioning of the equipment, the equipment will be checked and accepted according to the relevant international and national standards.

4, free to provide equipment consulting and debugging services for a long time.


Send message
Send an inquiry for this product
Name:
Email:
Telephone:
Content: